[1]
2025. Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis. Asian Journal of Social and Humanities. 3, 6 (Mar. 2025), 1194–1205. DOI:https://doi.org/10.59888/ajosh.v3i6.521.