[1]
2025. Comparative Analysis of Cost and Time in the Implementation of Rigid and Flexible Pavement: A Case Study of the Sambeng–Kedewan Road Section, Bojonegoro District. Asian Journal of Social and Humanities. 3, 10 (Jul. 2025), 1823–1836. DOI:https://doi.org/10.59888/ajosh.v3i10.580.