[1]
2025. Comparative Analysis Of Cost And Time In The Implementation Of Rigid And Flexible Pavement: A Case Study Of The Sambeng–Kedewan Road Section, Bojonegoro District. Asian Journal of Social and Humanities. 3, 10 (Jul. 2025), 1922–1929. DOI:https://doi.org/10.59888/ajosh.v3i10.583.