(1)
Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis. ajosh 2025, 3 (6), 1194-1205. https://doi.org/10.59888/ajosh.v3i6.521.