(1)
Comparative Analysis of Cost and Time in the Implementation of Rigid and Flexible Pavement: A Case Study of the Sambeng–Kedewan Road Section, Bojonegoro District. ajosh 2025, 3 (10), 1823-1836. https://doi.org/10.59888/ajosh.v3i10.580.