(1)
Comparative Analysis Of Cost And Time In The Implementation Of Rigid And Flexible Pavement: A Case Study Of The Sambeng–Kedewan Road Section, Bojonegoro District. ajosh 2025, 3 (10), 1922-1929. https://doi.org/10.59888/ajosh.v3i10.583.