1.
Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis. ajosh. 2025;3(6):1194-1205. doi:10.59888/ajosh.v3i6.521