1.
Comparative Analysis of Cost and Time in the Implementation of Rigid and Flexible Pavement: A Case Study of the Sambeng–Kedewan Road Section, Bojonegoro District. ajosh. 2025;3(10):1823-1836. doi:10.59888/ajosh.v3i10.580