1.
Comparative Analysis Of Cost And Time In The Implementation Of Rigid And Flexible Pavement: A Case Study Of The Sambeng–Kedewan Road Section, Bojonegoro District. ajosh. 2025;3(10):1922-1929. doi:10.59888/ajosh.v3i10.583