1.
Construction and Engineering Application of an Anti-Disturbance Control Power Supply System for Key Auxiliary Equipment in Coal-Fired Power Plants Under Weak Grid Conditions. ajosh. 2026;4(10):4728-4735. doi:10.59888/ajosh.v4i10.761