Comparative Analysis of Cost and Time in the Implementation of Rigid and Flexible Pavement: A Case Study of the Sambeng–Kedewan Road Section, Bojonegoro District. (2025). Asian Journal of Social and Humanities, 3(10), 1823-1836. https://doi.org/10.59888/ajosh.v3i10.580