Comparative Analysis Of Cost And Time In The Implementation Of Rigid And Flexible Pavement: A Case Study Of The Sambeng–Kedewan Road Section, Bojonegoro District. (2025). Asian Journal of Social and Humanities, 3(10), 1922-1929. https://doi.org/10.59888/ajosh.v3i10.583