“Comparative Analysis of Cost and Time in the Implementation of Rigid and Flexible Pavement: A Case Study of the Sambeng–Kedewan Road Section, Bojonegoro District”. 2025. Asian Journal of Social and Humanities 3 (10): 1823-36. https://doi.org/10.59888/ajosh.v3i10.580.