“Comparative Analysis Of Cost And Time In The Implementation Of Rigid And Flexible Pavement: A Case Study Of The Sambeng–Kedewan Road Section, Bojonegoro District”. 2025. Asian Journal of Social and Humanities 3 (10): 1922-29. https://doi.org/10.59888/ajosh.v3i10.583.