“Analysis of Brayton Cycle Efficiency at 100 MW Load Before and After Overhaul of Unit 1 Block 1 At PLTGU PT. PLN Nusantara Power Up Gresik” (2024) Asian Journal of Social and Humanities, 2(7), pp. 1540–1547. doi:10.59888/ajosh.v2i7.281.