[1]
“Evaluation of Cost Performance In The Surabaya-Gempol Toll Road Reconstruction Project Using Schedule Variance (SV) and Cost Variance (CV) Analysis”, ajosh, vol. 3, no. 6, pp. 1194–1205, Mar. 2025, doi: 10.59888/ajosh.v3i6.521.